Quick answer

Repair usually makes sense when an inverter is still under warranty and has a communication or grid-trip fault. Replacement is usually better when the unit is ten years or older, out of warranty, or showing a hardware fault such as an insulation, arc or IGBT error. A survey confirms the right option for your system.

Last updated:

A technician repairing an electronic circuit board with precision tools

Verdict: If your inverter is under 8 years old and the fault is a communication error, grid trip or firmware issue, repair is usually the better option. If it is 10+ years old, or the fault is a hardware failure (IGBT, relay, DC bus), replacement almost always makes more sense — a new inverter with a 10-year warranty costs less over its lifetime than repeated repairs on ageing hardware. Choosing a hybrid inverter at replacement time adds roughly £500–£1,000 but avoids a second installation (and second DNO notification) when you later add a battery, saving £800–£1,500 in future labour.

Assessment by Scottish Energy Efficiency, August 2026. Costs are indicative ranges based on Scottish supply-and-fit quotes. Your actual costs depend on system size, access, and inverter brand.

FactorRepairReplaceOur assessment
Upfront cost£150–£500£1,000–£1,800 (string) £1,400–£3,500 (hybrid)Repair cheaper short-term
Typical lifespan after work1–3 years (if inverter already 10+ years old)10–15 years (new inverter)Replace wins long-term
Risk of repeat failureModerate–high on ageing hardwareLow (new warranty)Replace wins
Battery-ready?No (string inverter stays)Yes (if hybrid chosen)Replace wins if battery planned
Second DNO notification needed later?Yes, if you later add batteryNo (hybrid handles it)Replace avoids a second notification
WarrantyLabour warranty only (parts case-by-case)10-year manufacturer warrantyReplace wins
VATAsk us about eligibilityAsk us about eligibilityConfirmed on your quote
Downtime1–2 hours1–2 hours (same-day for most systems)Equal
SEG eligibilityMaintainedMaintained (we file G98/G99)Equal

When repair makes sense: Communication faults, grid over/under-voltage trips, and firmware bugs on inverters under 8 years old. These are often resolved with a board swap or firmware update at a fraction of the cost of a full replacement.

When replacement is the right call: Arc faults, insulation faults, IGBT failures, relay failures, or any hardware fault on an inverter over 10 years old. The cost of a new inverter with a full warranty is almost always better value than repairing equipment that has reached end of design life.

The hybrid question: If you think you might add a battery in the next 5 years, a hybrid inverter at replacement time costs £500–£1,000 more than a standard string inverter — but saves you the cost of a second installation (typically £800–£1,500 in labour, scaffolding, and a second DNO notification). It is almost always worth doing once the inverter has failed anyway.

Sources: indicative pricing based on Scottish supply-and-fit quotes, August 2026. Warranty terms from manufacturer specifications. VAT relief per HMRC VAT Notice 708/6. All figures are ranges; a site survey gives exact figures for your system.

Scottish conditions that affect the decision

Wind-driven rain, cold winters and salty coastal air are hard on electronics. An inverter in an unheated garage in Fife or a damp loft in Argyll may age faster than the manufacturer figures suggest. If yours has already had one repair, a second fault often points to wider wear, and replacement is usually the more reliable choice.

Older units can also be hard to repair because spare parts and manufacturer support are no longer available. In that case a like-for-like swap or a hybrid upgrade is the practical route. If your system still has its Feed-in Tariff, keeping it generating matters, because every week offline is lost income.